پاکستان میں سولر پینل کے تازہ ترین ریٹس اور خبریں جانیں۔

Ziewnic has become one of the fastest-growing inverter brands in Pakistan over the last two years, driven by aggressive pricing on hybrid inverters. For budget-conscious buyers who still want a hybrid system with load-shedding backup, Ziewnic offers some of the most competitive prices in the market.

Ziewnic Inverter Prices in Pakistan 2026

Ziewnic Atlas Hybrid Inverters

ModelCapacityPrice (PKR)
Ziewnic Atlas II 3kW3kWRs. 85,000 – Rs. 105,000
Ziewnic Atlas II 5kW5kWRs. 125,000 – Rs. 150,000
Ziewnic Atlas II 6kW6kWRs. 150,000 – Rs. 178,000
Ziewnic Atlas II 8kW8kWRs. 195,000 – Rs. 230,000
Ziewnic Atlas II 10kW10kWRs. 230,000 – Rs. 270,000

Ziewnic On-Grid Inverters

ModelCapacityPrice (PKR)
Ziewnic On-Grid 3kW3kWRs. 52,000 – Rs. 65,000
Ziewnic On-Grid 5kW5kWRs. 72,000 – Rs. 88,000
Ziewnic On-Grid 10kW10kWRs. 155,000 – Rs. 185,000

Ziewnic Atlas II 5kW – Key Specs

SpecValue
Rated Output5,000W
Max PV Input6,000W
MPPT Channels2
Max Efficiency97.3%
Battery Voltage48V
Battery TypeLithium / Lead-Acid
WiFi MonitoringYes
Warranty5 years

Ziewnic Pros & Cons

Pros

Cons

Is Ziewnic Reliable?

Ziewnic has performed reasonably well in Pakistan over the past 2 years. It’s a good choice if your primary concern is upfront cost and you’re in a city with a nearby service center. If long-term reliability is the priority, Growatt or Solis may be a safer bet at a modest premium.

Check current panel prices at our solar panel price tracker.

Sources & references

Tariff, net-metering, and policy details on this page draw on the following official sources. Rates change often, so confirm current figures with the relevant authority or a licensed installer before you decide.

  • NEPRA — National Electric Power Regulatory Authority: electricity tariffs and the 2026 shift from net metering to net billing.
  • AEDB — Alternative Energy Development Board: solar policy, installer standards, and net-metering guidance.
  • Your local distribution company (DISCO) — for example LESCO, K-Electric, IESCO, MEPCO, PESCO or QESCO — for area-specific tariffs and the net-metering application process.