How to Apply for Net Metering in Pakistan 2026 — Step-by-Step Guide

How to Apply for Net Metering in Pakistan 2026 — Step-by-Step Guide

How to Apply for Net Metering in Pakistan 2026 — Step-by-Step Guide

Net metering allows solar system owners in Pakistan to sell surplus electricity back to the grid, dramatically reducing annual electricity bills. Under NEPRA’s net metering regulations (amended 2023), any residential or commercial consumer with a 1kW–1MW solar system can apply. This guide walks you through the entire process — documents, costs, timeline, and what to expect from your DISCO.

What is Net Metering in Pakistan?

Net metering is a billing arrangement where your electricity meter runs backwards when your solar system generates more power than you use. The surplus units are exported to your DISCO’s grid and credited to your account at the retail tariff rate. At the end of each billing cycle, you pay only for your net consumption (imported units minus exported units).

📊 Example: If you import 400 units from the grid and export 250 units from your solar system in a month, you are billed for only 150 net units — saving Rs 11,250–15,000 at current rates (Rs 45–60/unit).

Eligibility for Net Metering in Pakistan

  • System capacity: 1kW to 1,000kW (1MW)
  • System type: Grid-tied (on-grid) or hybrid solar systems
  • Consumer categories: Residential, Commercial, Industrial, Agricultural
  • Installer must be AEDB-licensed
  • Equipment must meet NEPRA-approved standards

Step-by-Step Application Process

  1. Install your solar system — Hire an AEDB-licensed installer. Installation takes 1–3 days.
  2. Obtain AEDB Generation License — Your installer applies for an AEDB generation license (systems under 25kW are exempt). Takes 2–4 weeks.
  3. Submit application to your DISCO — File the net metering application at your local DISCO office (LESCO, HESCO, FESCO, MEPCO, IESCO, PESCO, QESCO, GEPCO, or SEPCO) with all required documents.
  4. Technical inspection — DISCO engineers visit your site to inspect the installation. Typically within 7–21 days of application.
  5. Bidirectional meter installation — After approval, DISCO replaces your standard meter with a bidirectional meter. Cost: Rs 15,000–25,000 (borne by consumer).
  6. Net metering agreement signed — Sign the Net Metering Connection Agreement with the DISCO. Your system is now officially live.

Documents Required for Net Metering Application

DocumentDetails
CNIC copyApplicant’s national identity card
Electricity bill copyLatest 3 months’ bills from your DISCO
AEDB license / NOCYour installer’s AEDB license number
Single-line diagram (SLD)Electrical diagram of your solar system — prepared by installer
Equipment specificationsDatasheet of panels and inverter with model numbers
Site photographsPhotos of installed panels, inverter, and metering location
Net metering application formAvailable from DISCO office or their website

Net Metering Costs (2026)

Cost ItemAmount
Bidirectional meterRs 15,000–25,000
AEDB license fee (if required)Rs 5,000–15,000
Application processing feeRs 1,000–3,000 (varies by DISCO)
Total extra costRs 20,000–40,000

How Long Does Net Metering Take in Pakistan?

From application submission to live net metering, the typical timeline is 4–8 weeks for residential consumers. LESCO (Lahore) and IESCO (Islamabad) tend to be faster (3–5 weeks). HESCO and QESCO may take up to 10–12 weeks.

💡 Pro Tip: Submit your net metering application immediately after installation. Exported units before the bidirectional meter is installed are not credited.

Net Metering Tariff Rates in Pakistan 2026

Under NEPRA regulations, exported solar units are credited at the applicable retail tariff rate for your consumer category — approximately Rs 45–58/unit for domestic consumers. Units exported beyond your monthly consumption roll over as a monetary credit on your next bill.

Frequently Asked Questions

❓ Can I apply for net metering myself or do I need an installer?
In practice, your AEDB-licensed installer handles most of the paperwork including the SLD, equipment specs, and AEDB documentation. You attend the DISCO office yourself for the formal application and agreement signing.
❓ Does a hybrid solar system qualify for net metering?
Yes. Both on-grid and hybrid solar systems are eligible for NEPRA net metering. The inverter must be grid-tied (not off-grid). Popular hybrid inverters like Growatt SPH, Huawei SUN2000, and Solis all support net metering.
❓ What happens to my exported units if I don’t use them?
Unused export credits roll forward to the next billing cycle as a monetary credit. At annual reconciliation, if credits remain unused, NEPRA regulations require DISCOs to pay you at the avoided cost rate for any remaining balance.
❓ Is net metering available in all cities of Pakistan?
Yes. All nine DISCOs in Pakistan are required under NEPRA regulations to offer net metering to eligible consumers. Processing times and procedures may vary by DISCO.
Planning to go solar and apply for net metering?

Check our Solar Panel Prices and System Size Guides to plan your system before installation.

Sources & references

Tariff, net-metering, and policy details on this page draw on the following official sources. Rates change often, so confirm current figures with the relevant authority or a licensed installer before you decide.

  • NEPRA — National Electric Power Regulatory Authority: electricity tariffs and the 2026 shift from net metering to net billing.
  • AEDB — Alternative Energy Development Board: solar policy, installer standards, and net-metering guidance.
  • Your local distribution company (DISCO) — for example LESCO, K-Electric, IESCO, MEPCO, PESCO or QESCO — for area-specific tariffs and the net-metering application process.