PM Solar Scheme Pakistan 2026 — Full Eligibility and Application Guide
What Is the PM Solar Scheme?
The PM Solar Scheme (also called the “Solarization of Homes” program) aims to reduce Pakistan’s dependence on imported fossil fuels and provide affordable electricity to households currently paying high WAPDA bills. The scheme operates through a combination of direct subsidies, government-backed loans via commercial banks, and panel distribution through DISCO networks.
Who Is Eligible for the PM Solar Scheme 2026?
| Category | Eligibility Criteria | Benefit |
|---|---|---|
| Low-income households | Monthly WAPDA bill under Rs. 3,000 (below 200 units/month) | Subsidized or free solar panel kit |
| Middle-income households | Bill Rs. 3,000–15,000/month, valid CNIC, own property | Government-backed low-interest loan |
| Farmers / tube well owners | Agricultural land with tube well connection | Solar pump subsidy |
| Government employees | Active government service, property ownership | Special installment plan |
What Do You Receive Under the Scheme?
- Solar panel kit (typically 1kW–5kW depending on your WAPDA bill tier)
- Hybrid or on-grid inverter (DISCO-accepted brand)
- Net metering application assistance through your DISCO
- Installation by an an installer enlisted with PPIB
- 1–2 year system warranty via the scheme
How to Apply — Step-by-Step
- Check eligibility — Visit ppib.gov.pk or your DISCO’s official website and check current scheme phase requirements against your last 3 WAPDA bills.
- Gather documents — CNIC, last 3 electricity bills, property ownership proof (or landlord NOC for renters), bank account details.
- Register online or at DISCO office — Submit your application in person at your regional DISCO office (LESCO, HESCO, MEPCO, PESCO, etc.).
- Wait for verification — DISCO field teams visit your property to verify eligibility, roof space, and load assessment. This typically takes 2–8 weeks.
- System installation — Once approved, an an installer enlisted with PPIB is assigned. Installation is typically completed within 4–6 weeks of approval.
- Net metering activation — After installation, your DISCO processes the net metering connection, allowing you to sell excess solar power back to the grid.
PM Solar Scheme vs Independent Solar Purchase — Comparison
| Factor | PM Solar Scheme | Independent Purchase |
|---|---|---|
| Upfront cost | Zero to subsidized | Full market price |
| Brand choice | Government-assigned | Your choice |
| Installation timeline | 2–6 months (queue) | 1–4 weeks |
| System size | Fixed by bill tier | Any size you choose |
| Warranty support | Scheme warranty + brand | Brand warranty only |
| Net metering | Included in process | You arrange separately |
Common Mistakes to Avoid
DISCO-accepted Solar Companies — How to Choose a Vendor
Whether you install through a government scheme or buy privately, always use a vendor enlisted with PPIB. PPIB keeps the registration records for solar companies certified under the AEDB (Certification) Regulations, 2021. Using a PPIB-enlisted installer protects your equipment warranty and is usually required to get your net-metering connection approved by your DISCO.
How to check if a solar company is DISCO-accepted:
- Visit the official PPIB website (ppib.gov.pk) and open the list of registered net-metering vendors / licensed solar companies.
- Confirm the company name and licence number match what the vendor gives you in writing.
- Ask for the vendor’s PPIB registration number and DISCO net-metering experience before signing.
- Avoid installers who cannot show current PPIB registration — unregistered work can delay or block your net-metering approval.
Not eligible for the scheme, or want to compare before you apply? See current market rates on our solar panel price homepage, or check local prices for Lahore, Multan and other cities to see what a private installation would cost.
Frequently Asked Questions
🌞 Planning your solar setup in 2026?
Compare current panel prices or calculate what size system your home needs.
Today’s solar panel prices → | Net metering guide → | 5kW system cost →
PM Solar Scheme 2026 — Latest Updates (CM Punjab)
Who Is Eligible Under the CM Punjab Solar Scheme 2026?
- Punjab resident with a valid CNIC showing a Punjab address
- Active electricity connection with LESCO, MEPCO, FESCO, GEPCO, or PESCO
- Sanctioned load under 2 kW
- Average monthly consumption of 0–200 units
- Must not have previously received a government solar subsidy
How to Apply for PM Solar Scheme Online in 2026
- Visit cmsolarscheme.punjab.gov.pk on your phone or desktop
- Click Register and enter your full name, CNIC, and mobile number
- Enter your electricity Reference Number (14 digits from your bill) and select your DISCO (LESCO, MEPCO, etc.)
- Upload clear photos of: front & back of CNIC, last paid electricity bill, and property ownership proof
- Submit and note your Tracking ID for status updates
What Solar Equipment Will You Receive?
Approved applicants receive a complete solar installation at zero cost:
- Solar panels (capacity based on your sanctioned load)
- A certified hybrid inverter
- Battery backup system
- Full wiring and installation by a government-certified solar contractor
Important: Government solar-scheme terms, quotas, subsidy amounts and deadlines change often. This guide explains how the scheme works, but always confirm the current status, eligibility and last date on the official portal cmsolarscheme.punjab.gov.pk (or PPIB for national programmes) before applying. Never pay anyone a fee to “register” you — official registration is free.
Sources & references
Where this page states a rule, a tariff or a registration requirement, it comes from the documents below. Links go to the document itself, not a homepage. Prices on this page come from our own daily rate feed, not from these sources.
- NEPRA (Prosumer) Regulations, 2026 — notified 6 August 2026. Sets the framework that replaced straight net metering with net billing. Under it, a prosumer facility of 25 kW or below does not need concurrence from the Authority.
- NEPRA net-metering licences — the register of issued distributed-generation and net-metering licences.
- Checklist for enlistment of installers under the AEDB (Certification) Regulations, 2021 — the actual requirements an installer must meet. Note that AEDB was dissolved and merged into PPIB in July 2023, so enlistment is handled by PPIB, even though the regulations still carry the AEDB name.
- Your distribution company — LESCO, MEPCO, FESCO, GEPCO, IESCO, PESCO, QESCO, HESCO, SEPCO or K-Electric — for the tariff that applies to your area and the net-metering application itself. K-Electric runs its own process, separate from the DISCOs.
Regulatory links last checked 4 October 2026. Rules change; confirm current figures with the authority or a licensed installer before you commit money.



