Cold storage facilities and warehouses in Pakistan have unique solar needs: high constant electrical loads, 24/7 operation, and zero tolerance for power interruption. Solar with battery backup offers transformative economics for this sector.
The Cold Storage Problem in Pakistan
- Cold storage runs 24/7 — refrigeration compressors draw 20–200kW continuously regardless of time of day
- Load shedding causes temperature excursions — product spoilage can cost Rs 500,000–5,000,000 per incident
- Diesel generators running 6–8 hours/day of load shedding cost Rs 150,000–600,000/month in fuel
- Commercial electricity tariffs (C2) are Rs 55–80/unit — cold storage bills easily reach Rs 300,000–1,500,000/month
- Solar + battery hybrid can eliminate both grid bills and generator costs simultaneously
Recommended System Sizes — Cold Storage
| Facility Size | Typical Load | System Size | Monthly Saving |
|---|---|---|---|
| Small cold room (100 MT) | 20–40 kW | 25kW + 50kWh battery | Rs 120,000–200,000 |
| Medium cold storage (500 MT) | 80–150 kW | 100kW + 200kWh battery | Rs 450,000–900,000 |
| Large cold chain facility | 300–600 kW | 300kW + 500kWh+ battery | Rs 1,500,000–4,000,000 |
| Industrial freezer warehouse | 500kW–1MW+ | Custom project | Rs 3M–8M+ |
Battery Sizing for 24/7 Cold Storage
Cold storage solar requires large battery banks to cover nighttime refrigeration loads. A general rule: for every 10kW of continuous refrigeration load, plan for 40–60kWh of battery capacity to cover 4–6 hours of overnight demand. This keeps product temperatures safe through the night.
| Storage Size | Night Load | Battery Needed | Battery Cost (LiFePO4) |
|---|---|---|---|
| 100 MT cold room | 15–20 kW | 80–120 kWh | Rs 1,600,000–2,400,000 |
| 500 MT facility | 60–80 kW | 300–480 kWh | Rs 6,000,000–9,600,000 |
| 1,000 MT facility | 120–160 kW | 600–960 kWh | Rs 12,000,000–19,200,000 |
Warehouse Solar (Non-Refrigerated)
Dry warehouses have simpler solar needs — primarily lighting, ventilation fans, forklifts, and office loads. A 50–100kW on-grid system is typically sufficient:
- Warehouse lighting (LED): 20–50kW for a large facility
- Ventilation and exhaust fans: 5–20kW
- Office and security systems: 5–10kW
- Electric forklift charging: 20–50kW (if applicable)
- Total dry warehouse: 50–130kW system recommended
ROI Comparison — Cold Storage Solar
| Scenario | Monthly Cost (Before) | Monthly Cost (After) | Monthly Saving | Payback |
|---|---|---|---|---|
| 100 MT cold storage | Rs 280,000 | Rs 30,000 | Rs 250,000 | 10–14 months |
| 500 MT facility | Rs 900,000 | Rs 80,000 | Rs 820,000 | 12–16 months |
Cold storage solar projects require careful engineering. Engage an EPC contractor with specific cold chain solar experience. The refrigeration compressor startup surge current (3–5× running current) must be accounted for in inverter sizing.
Get Cold Storage Solar Proposals
Consult PPIB-enlisted EPC contractors specialising in commercial and industrial solar.
Sources & references
Where this page states a rule, a tariff or a registration requirement, it comes from the documents below. Links go to the document itself, not a homepage. Prices on this page come from our own daily rate feed, not from these sources.
- NEPRA (Prosumer) Regulations, 2026 — notified 6 August 2026. Sets the framework that replaced straight net metering with net billing. Under it, a prosumer facility of 25 kW or below does not need concurrence from the Authority.
- NEPRA net-metering licences — the register of issued distributed-generation and net-metering licences.
- Checklist for enlistment of installers under the AEDB (Certification) Regulations, 2021 — the actual requirements an installer must meet. Note that AEDB was dissolved and merged into PPIB in July 2023, so enlistment is handled by PPIB, even though the regulations still carry the AEDB name.
- Your distribution company — LESCO, MEPCO, FESCO, GEPCO, IESCO, PESCO, QESCO, HESCO, SEPCO or K-Electric — for the tariff that applies to your area and the net-metering application itself. K-Electric runs its own process, separate from the DISCOs.
Regulatory links last checked 4 October 2026. Rules change; confirm current figures with the authority or a licensed installer before you commit money.