Solar Panel Installation Cost in Pakistan 2026 — Complete Breakdown
Average Installation Cost Per kW in Pakistan (2026)
| System Size | Total System Cost | Installation Labor Only |
|---|---|---|
| 3kW On-grid | Rs 3,80,000–4,50,000 | Rs 15,000–22,000 |
| 5kW On-grid | Rs 5,80,000–6,80,000 | Rs 20,000–30,000 |
| 5kW Hybrid (+ 10kWh battery) | Rs 7,60,000–9,40,000 | Rs 25,000–38,000 |
| 8kW Hybrid | Rs 11,50,000–14,40,000 | Rs 30,000–45,000 |
| 10kW Hybrid | Rs 14,60,000–18,20,000 | Rs 38,000–55,000 |
Installation labor typically accounts for 5–8% of total system cost.
Full Cost Breakdown — What You’re Actually Paying For
1. Solar Panels (40–50% of total cost)
The largest single cost. Panels for a 5kW system (9× 580W Longi/Jinko) cost Rs 1,45,000–1,85,000.
2. Inverter (15–20% of total cost)
A 5kW hybrid inverter (Growatt SPH5000, Solis, or Huawei SUN2000) costs Rs 95,000–135,000. On-grid inverters are Rs 20,000–40,000 cheaper than hybrid equivalents.
3. Mounting Structure (5–8%)
Galvanized iron (GI) or aluminum roof-mounting frames for a 5kW system cost Rs 28,000–40,000.
4. DC & AC Wiring + Safety Equipment (4–6%)
Includes DC solar cables (4mm²–6mm² rated), AC breakers, DC disconnect switch, surge protection devices, and earthing. Typically Rs 18,000–28,000 for a 5kW system.
5. Installation Labor (4–6%)
Covers panel mounting, inverter installation, wiring, commissioning, and testing. Reputable installers charge Rs 20,000–30,000 for a 5kW system.
6. Batteries (if hybrid) (25–35% of total)
Two 5kWh LiFePO4 batteries (10kWh total) add Rs 1,80,000–2,60,000.
7. Net Metering (extra, one-time)
Bidirectional meter: Rs 15,000–25,000. AEDB/DISCO fees: Rs 5,000–15,000. Total: Rs 20,000–40,000.
Hidden Costs to Watch Out For
- Electrical panel/DB board upgrade — Rs 8,000–20,000
- Roof reinforcement for heavy panel load — Rs 10,000–30,000 (rarely needed)
- Extended DC cable runs — Rs 5,000–15,000
- Monitoring system/WiFi dongle — Rs 3,000–8,000
- Annual maintenance contract — Rs 5,000–15,000/year
Installation Timeline
A standard residential 5kW system takes 1–2 days to install. Larger 8–10kW systems take 2–3 days. Net metering application adds 4–8 weeks after installation.
Frequently Asked Questions
See our 5kW, 8kW, and 10kW system price guides with full component breakdowns.
Sources & references
Tariff, net-metering, and policy details on this page draw on the following official sources. Rates change often, so confirm current figures with the relevant authority or a licensed installer before you decide.
- NEPRA — National Electric Power Regulatory Authority: electricity tariffs and the 2026 shift from net metering to net billing.
- AEDB — Alternative Energy Development Board: solar policy, installer standards, and net-metering guidance.
- Your local distribution company (DISCO) — for example LESCO, K-Electric, IESCO, MEPCO, PESCO or QESCO — for area-specific tariffs and the net-metering application process.







