Solar Panel Subsidy in Pakistan 2026 — Government Schemes Explained
1. PM Solar Programme (Roshan Ghar)
The Prime Minister’s Roshan Ghar Initiative aims to distribute subsidized solar panels to low-income households. Under the scheme, eligible consumers receive solar systems at below-market prices through ESCO-licensed installers and development finance institutions.
| Detail | Info |
|---|---|
| Target beneficiaries | Domestic consumers using under 200 units/month (protected category) |
| System size | Typically 0.5kW–1kW (solar home systems) |
| Subsidy amount | Up to 30–50% of system cost (varies by scheme iteration) |
| Application | Through ESCO-registered installers or NADRA-linked portals |
2. Green Banking / Solar Financing by Commercial Banks
| Bank | Product | Rate (approx.) | Tenure |
|---|---|---|---|
| HBL | HBL Noor Solar Loan | 12–16% per annum | Up to 5 years |
| Bank Alfalah | Solar Financing | 11–15% per annum | Up to 5 years |
| MCB Bank | MCB Solar Finance | 12–16% per annum | Up to 5 years |
| Meezan Bank | Solar Diminishing Musharakah | 13–17% per annum (Islamic) | Up to 5 years |
| NBP | Kissan Solar Scheme | Subsidized (agriculture) | Up to 7 years |
3. Net Metering Incentive
While not a direct cash subsidy, NEPRA’s net metering policy is effectively a permanent ongoing subsidy — your DISCO credits exported solar units at full retail tariff (Rs 45–60/unit), enabling complete bill offset for many homes.
4. SBP’s Refinancing Scheme for Renewable Energy
The State Bank of Pakistan (SBP) has a refinancing scheme for renewable energy projects. Under this scheme, banks can offer solar loans at below-market rates (7–10% for eligible projects). Commercial and agricultural solar projects of 1MW+ typically qualify.
5. Tax Exemptions on Solar Equipment
The Federal Board of Revenue (FBR) exempts solar panels, inverters, and related equipment from custom duties and sales tax under the Solar Energy Policy. This effectively reduces equipment costs by 15–25% compared to unexempted prices — a built-in subsidy all buyers automatically benefit from.
How to Find Current Solar Subsidies
- Visit ppib.gov.pk for the latest DISCO-accepted schemes
- Check your provincial government website — Punjab, KPK, and Sindh have run their own solar programmes
- Ask your bank’s solar desk about current green financing products
- Consult your DISCO for any utility-sponsored solar programmes
Frequently Asked Questions
Check our 5kW and 10kW system price guides to plan your investment before approaching a bank or installer.
Sources & references
Where this page states a rule, a tariff or a registration requirement, it comes from the documents below. Links go to the document itself, not a homepage. Prices on this page come from our own daily rate feed, not from these sources.
- NEPRA (Prosumer) Regulations, 2026 — notified 6 August 2026. Sets the framework that replaced straight net metering with net billing. Under it, a prosumer facility of 25 kW or below does not need concurrence from the Authority.
- NEPRA net-metering licences — the register of issued distributed-generation and net-metering licences.
- Checklist for enlistment of installers under the AEDB (Certification) Regulations, 2021 — the actual requirements an installer must meet. Note that AEDB was dissolved and merged into PPIB in July 2023, so enlistment is handled by PPIB, even though the regulations still carry the AEDB name.
- Your distribution company — LESCO, MEPCO, FESCO, GEPCO, IESCO, PESCO, QESCO, HESCO, SEPCO or K-Electric — for the tariff that applies to your area and the net-metering application itself. K-Electric runs its own process, separate from the DISCOs.
Regulatory links last checked 4 October 2026. Rules change; confirm current figures with the authority or a licensed installer before you commit money.